The basement is completely dug out, and no rock! Wow, what a relief...that saves us a good chunk of money that we had figured on needing. There's rock all over that property, but the 46'x54' hole that we picked was rock free...amazing!

The footers are dug, and we're ready for that inspection. As soon as we get the go ahead from the inspector, they'll pour our concrete for the footers and start stacking block just over 9' tall. We've got them going 9' so that we'll have enough room for our ductwork/wiring so that when we finish out the basement space, we'll have full 8' ceilings downstairs.